site_map close btn
--

CREATE THE FUTURE OF KOREA

□ Electricity Service

전시업무 진행 일정표
  Supply System Rate per KW
Booth Lighting 220V 60Hz (single phase) USD 60/KW
Exhibits Operation 220V 60Hz (single phase)
220V 60Hz (three phase)
Special Usage 380V 60Hz (three phase)
For 24 Hours USD 80/KW
  1. ①   The mode of power supplied in exhibition hall (60Hz) : A.C. single phase - 220V / A.C. three phase - 220V, 380V
  2. ②   Electricity installation and usage expense: USD 60/KW (USD 20/KW shall be added for 380V and 24 hours use electricity)
  3. ③   Please apply for electricity by submitting the Facilities Application by Mar. 31, 2018.
  4. ④   Any exhibitors that requires a neutral line (limited to 380 volts) should indicate this fact on the Utilities Application Form. Since 110V is not provided, any company that needs this voltage should install a down transformer or make other arrangements.
  5. ⑤   According to the capacity applied by the Exhibitors, wiring for power and lighting shall come from a pit built on the floor of the exhibition space and breakers installed in each booth(s).
  6. ⑥   Secondary wiring, and wiring including plugs and lighting from the breakers should be installed by the participating company at its own expense.
  7. ⑦   Safety Devices for Exhibits The electric current is provided by KEPCO→COEX substation→each booth(s). When the demonstrated products have been damaged by power cut off and abnormal voltage (under 200volt), the Secretariat shall not be responsible for any damage incurred. Therefore, the exhibitors needs to install safety devices (AVR, UPS,…, etc.).
  8. ⑧   Electricity shall be cut off at 5:00 pm on May. 18, 2018 in principle.
  9. ⑨   Any company that needs electricity supply after the daily closing of the exhibition or even after the exhibition should apply to the Secretariat Office in advance.

□ Communication Service: Telephone · Internet

전화 · 전용선
  1. ①   In the exhibition space, temporary telephone and exclusive internet line can be installed. Any exhibitor should apply to the Secretariat Office, using the Utilities Application Form, by Mar. 31, 2018.
  2. ②   The temporary telephone usage expense is USD 300 per phone, and the Internet exclusive line is USD 250 per port. These include rent, installation and international phone calls.
  3. ③   The line for the temporary telephone can be used as a fax line. However, the exhibitor should make their own preparations for their own fax machine.
  4. ④   The line available duration is from May. 14 to 5pm, May. 18, 2018.

□ Water Supply Service

  1. ①   A company requiring a water supply for a product demonstration should apply to the Secretariat Office by filling out the Utilities Application Form by Mar. 31, 2018. after checking the precise estimation to be used.
  2. ②   Water supply and drainage construction will be conducted in a blanket manner by the Secretariat, and expenses shall be the responsibility of the concerned companies.
  3. ③   The installation expense and usage fee per place are as follows.
Basic Sizes Installation & Usage Expense
Feed Pipe 15mm USD 300
Drain Pipe 25mm
  1. ④   When the inner diameter of water supply and drainage are different from the basic specifications, additional expenses should be paid.
  2. ⑤   Water pressure is about 0.8kg/㎠(maximum).

□ Compressed Air Service

  1. ①   A company that needs compressed air for a product demonstration should apply for compressed air, by filling out the Utilities Application Form by Mar. 31, 2018. after checking the precise estimation, to the Secretariat Office.
  2. ②   The cost of the compressed air facility construction will be borne by a concerned company. For the safety of the exhibition hall, the Secretariat Office will conduct blanket construction.
  3. ③   The facility construction expense and its usage expense are USD 300 per place.
  4. ④   The inner diameter of the compressed air pipe hose is 9mm, and if requirements are different from the basic specifications, extra construction expenses will be paid by the concerned company.
  5. ⑤   Air pressure is about 5kg/㎠(maximum).

□ RF Visitor Registration System

데이터 샘플화면

(Fig.#1) Sampled Data

  1. ①   The Secretariat provide the gathered visitors' data through RF registration system to the applied exhibitors. Each visitor receive the RF pass-card with personal data when they registrate at the lobby of the exhibition hall. The exhibitors with RF data collecting devices can save visitors' personal detail by simple procedure at their booth. The data will be send to each exhibitor within a week in English.
  2. ②   A company that needs RF registration system should apply by filling out the Utilities Application (Form-3) by Mar. 31, 2018. to the Secretariat Office.
  3. ③   The temporary RF registration system rent charge is USD 100 per device.